S/Y Solveig — TODO

Boat was launched 2026-07-03 at Varna and is now in the water.

Items marked [on-land] are much easier / only possible while out of water, and have to wait for the next haul-out. Unmarked items can be done underway or at anchor.


Hull & Rudder (on-land, WiP)

Hull

uff... mission failure

Bow platform / anchor roller (diary-2026.md 2026-05-15, todo-tortuga-boatlift.md)

The bow platform was installed 2026-07-18 ("more or less"), so the anchor chain can be used again — but see diary-2026.md 2026-07-18 for the bolts and the bow ladder support that remain. The rest still needs stainless steel welding, which I have no competence on — and now that the boat is in the water, shore power for the stick welder is a lot harder to come by.


Varnishing — Hull Sides (on-land)

Status 2026-07-05:


Elastic Glue / Deck Sealing

Research

Super-elastic

Super-power

Procrastinate

Remaining epoxy / fibre works

Solar Panels

Deck connections

Elastic-glue watertighting of the solar deck connections (and the pantry 220V cables) is tracked in the Elastic Glue / Deck Sealing section.


Water System — Port Sofa Cluster

These share access: disassemble the port sofa to reach water tanks, hot water tank, and plumbing behind it.


Water System — Other


Bilge Pumps


Engine


Rigging & Sails


Electrical


Boat Assistant (Raspberry Pi Project)


Varnishing — Interior & Superstructure (long-term)


Fridge / Kitchen / Domestic


Dinghy & Bikes

Shopping List


Administrative / Logistics