Cradle project — S/Y Solveig

Refined project description, urgent welding tasks, and photo gallery of tripod parts (for welders).

Short summary

I need an experienced welder to finish a cradle made from six adjustable tripods. The tripods are currently tack-welded and the critical joints require proper welding. Estimated urgent work: 3–4 hours on the tripod joints (must be done by an experienced welder). There may be an additional ~3–4 hours of lighter welding and assembly work which is optional.

Location: Marina Tortuga, Mladost district, Varna — welding should be done on site (I don’t have transport). For weekend work I need notice to arrange electricity. Suggested compensation: 20 EUR/hour + lunch (negotiable).

Technical details

Measurements & fit notes

Critical welding requirements

Photo gallery — tripod parts

Click an image to open the fullsize photo on your server.

Overview 1
Overview: assembled tripods, general layout.
Overview 2
Overview: different angle, spacing and pads.
Lower joint
Lower joint detail showing tack welds and tube ends.
Upper joint
Upper joint / adjustable insert detail.
Pad
Pad and frame with rubber profile.
Reinforcement
Reinforcement plates and inserts.
Rubber profile
Rubber profiles for pads.
Wrap metal
Wrap plate / strap detail for reinforcement.

Parts missing / action list

Suggested next steps for a welder

  1. Inspect tack welds and the thin tube areas; recommend tubing/plate sizes if underspecified.
  2. Confirm measurements and check alignment with the boat in the cradle position.
  3. Weld wrap plates and critical joints; fit and weld X braces at bow and stern.
  4. Fit pads, test-adjust inserts, and tie base frame together. Perform staged-load test and inspect welds.
If you want the original detailed task list (markdown) included here, paste it and I will add it. All photos are loaded from your server; opening them requires that the server is reachable.